Question: 

A preliminary budget and schedule should be formulated before the physical aspects of the facility design are begun, and should be revised as the project proceeds. Some aspects of it will continue in a parallel fashion to the design process. What are the items that are usually included in the budget.

I.      Land cost
II.     Legal fees
III.    Contingencies
IV.    Surveys
V.     Environmental Assessment
VI.    Financing costs
VII.   Construction cost
VIII.  Designers' fees
IIX.   Furniture, fixtures, equipment and furnishings.

A.   All of the Above
B.   I, II, IV, VI
C.   All of the above except IIX
D.   All of the above except III